Freeport-McMoRan – Black Chimney Stack Demolition
Miami Smelter Black Stack Demolition
Perform demolition of the 243 ft tall stack, with diameter ranging 26ft -37ft and 1ft-3ft in thickness.
Utilizing patented innovative MANTIS 360° Cricket demolition system allowing operator and crew access while maintaining safe distance from demolition.
Scaffolding and netting system that prevents falling debris outside the exterior of the stack
Comply with OSHA, MSHA and site specific safety requirements
Dust suppression water system included on Cricket and at base of stack to minimize dust
Our demolition process is faster and safer than traditional methods, ensuring efficient results with minimal risk