Engineering, procurement, and construction (EPC) services required for the conversion of the Napanee Generating Station 14-cell cooling tower to a fully operative Parallel Path Wet Dry (PPWD) plume abated tower
Innovative modular construction to minimize shutdown duration
Design, supply and installation of 56 ea. Dry Finned Heat Exchangers c/w electric actuated louvers
Design, supply and installation of vacuum priming system
Achieved stringent plume abatement guarantee, securing ECA permit Design, supply and installation of electrical and instrumentation equipment, field devices, primary elements, final control elements, pre-wired skid packages, electrical heat tracing, electrical distribution, lighting, and lightning protection
Upgrade cooling tower fans, motors, and associated equipment
Removed existing PPWD pumps and motors and replace with 81 APH vertical centrifugal pump booster pumps and 4850HP motor, delivering a flow of over 265,000 GPM